Global Manufacturing Partner
Get in Touch with ZetarVac
Ready to scale your production? Our engineering team is standing by to discuss your Heavy-Gauge Thermoforming and Vacuum Forming needs.
Contact Information
Factory Location
No. 123, Industrial Avenue, Innovation District, Shenzhen, China
Why Partner with ZetarVac?
- 45 Production Lines for massive scalability.
- ISO 9001, 13485 (Medical), 14001, 45001 Certified.
- Experts in Kydex, ABS, HDPE (400+ materials).
- Rapid Tooling: 100+ sets of molds delivered monthly.
Start Your Project
Fill out the form below for a quote. Please include details about material requirements and estimated annual volume.
Global Reach, Local Service
From our headquarters in Shenzhen, we serve heavy industry clients across North America, Europe, and Asia with optimized logistics solutions.
Manufacturing Hub
Shenzhen, China
Strategic proximity to Yantian Port for rapid global shipping.
Frequently Asked Questions
What is your typical lead time for large molds?
With our 45 production lines, we typically deliver prototypes within 3-5 days. For heavy-gauge production molds, lead times are generally 2-3 weeks, significantly faster than the industry average.
Do you provide design assistance for vacuum forming?
Yes. Our engineering team provides DFM (Design for Manufacturing) analysis to optimize your parts for the thermoforming process, ensuring structural integrity while reducing material costs.
What file formats do you need for a quote?
We recommend 3D STEP (.stp) or IGES (.igs) files for the most accurate quotes. PDF drawings are also helpful for specifying tolerances, textures, and material requirements.